Breaking

Search This Blog

Tuesday, August 2, 2022

Download Risk Assessment - Tower Crane Erection & Installation

Download the Hazard Identification & Risk Assessment - Tower Crane Erection & Installation👈

The construction industry consists of various activities and lifting activity is one of these acts that require lifting equipment. The load is lifted either using the mobile crane or the tower crane and transported to either a higher point or moved around the worksite.

In addition to that, the construction industry is the hazardous one, so the lifting activity. There are the various factors which can influence the lifting activity, so a job without any planning can lead to different consequences, hence before job commencement these factors should be considered and relevant controls should be implemented so that the probability of the accident is reduced to minimum.

A formal risk assessment should be performed so that all of the hazards are identified, and relevant controls are adapted to reduce the risk to a minimum. Follow the link mentioned above☝and download it in the editable form.

Moreover, to ensure safe lifting operation execution, the activity should be planned and executed by a competent person. A formal comprehensively devised lift plan should be developed, implemented, and communicated to everyone engaged in the lifting activity.

Click here to download the Lift Plan in editable form and implement it.



No comments:

Post a Comment