Breaking

Search This Blog

Saturday, November 12, 2022

November 12, 2022

Fire Pump Monthly Inspection Checklist - NFPA

Download the Fire Pump Monthly Inspection Checklist - NFPA👈

A fire pump is part of the firefighting system and plays the role of the main component. It is used to supply water to the fire sprinklers and maintain pressure when not in use. The fire pump must be inspected on a regular basis in order to ensure it is functional and ready to use at any time. The fire pump is installed by competent people hence its inspection also requires a competent person.

A formal checklist can be designed and implemented so that a thorough inspection procedure can be performed and nothing is missed. 

Follow the link available above and download the document in the editable format.



Wednesday, November 9, 2022

November 09, 2022

Mobilization Risk Assessment

Download the Mobilization Risk Assessment👈

Mobilization Risk Assessment is part of the Mobilization Plan which is carried out in order to identify the hazards and the risks associated with it so that timely corrective actions can be identified and implemented to minimize and mitigate the adverse effects. The risk assessment consists of the formal procedure which is used to identify the hazards against a specific activity, the associated risks, and their risk level is also identified.

Once the severity level is identified, the effectiveness of the existing controls will be evaluated to verify if they are sufficiently effective, otherwise new or additional controls will be identified and implemented. Through the monitoring process, their effectiveness will be monitored and on-spot corrections will be made to keep the effectiveness.

Follow the link available and download the Mobilization Risk Assessment form in excel format.



Wednesday, November 2, 2022

November 02, 2022

Mobilization Plan

Download the Mobilization Plan👈

Mobilization Plan means a plan devised by the contractor describing the mobilization of the workers, equipment, tools, machinery, and other objects for project execution.

The plan helps in determining the cost of the equipment, workers, setting up the laydown area, offices, building areas, and other general facilities to commence and deliver the project by maintaining high standards of quality, safety, and environmental protection standards.

It can be attached to the Project Plan document and comes with multiple other forms attached as its appendices. The document can be downloaded in editable format. Follow the link available above and download the document.